Skip to content

Dirt Calculator

This dirt calculator gives fill dirt in cubic yards, tons and truckloads: 20 × 15 ft at 6 in takes 5.56 cubic yards.

Area shape

Example depth. Enter the depth you need to fill.

For uneven ground and spills.

You need

5.56cubic yards

Cubic feet
150 ft³
Cubic meters
4.25 m³
Weight (dry fill dirt)
5.85 tons
Tandem loads (12 yd³)
1
Single-axle loads (6 yd³)
1

A 20 ft × 15 ft area, 6 in deep, needs 5.56 cubic yards of fill dirt (150 cubic feet).

Estimate only — confirm quantities with your supplier before ordering.

More options: material, weight and price

Use it as a fill dirt calculator for low spots, holes, trenches, raised grades and pads. The calculator opens with an example; replace it with your own measurements. It gives loose cubic yards, which is how dirt is delivered, plus the weight and the number of dump-truck loads. For lawns and beds, the topsoil calculator and the raised bed soil calculator have the right defaults.

Key facts

How we calculate

Formula

Cubic yards = length (ft) × width (ft) × depth (in) ÷ 12 ÷ 27

Tons = cubic yards × weight (lb per yd³) ÷ 2,000

Truckloads = cubic yards ÷ truck capacity, rounded up

Assumptions and defaults

  • The fill dirt weight is the Rockland figure, used because it falls inside the Army manual’s range for dry earth (loam or silt). Pick Custom density to use your supplier’s figure.

  • Results are loose cubic yards: dirt as it sits in the truck. Compacted fill takes up less room, so see the compaction section below.

  • Truck sizes come from the Texas Department of Transportation. Truckloads always round up.
  • The extra field starts at zero so you decide how much margin to add.
A rectangular area with length, width and depth labelledlengthwidthdepth

How much dirt do I need?

To work out how much dirt you need, multiply the area by the depth and convert to cubic yards. In practice:

  1. Measure the length and width of the area in feet.
  2. Measure how deep the fill needs to be. Take several readings and average them if the ground slopes.
  3. Divide the depth in inches by 12 to get feet.
  4. Multiply length × width × depth to get cubic feet, then divide by 27 for cubic yards.
  5. Add extra for settling and compaction, then round up.

For a dip in the yard 30 feet long and 10 feet wide that needs 4 inches of fill, that is 100 cubic feet, or 3.7 cubic yards.

Filling a hole or trench

A hole is just a box with depth. Multiply length × width × depth, all in feet. A hole 4 feet square and 3 feet deep holds 48 cubic feet, which is 1.78 cubic yards. A trench 40 feet long, 1 foot wide and 2 feet deep needs 2.96 cubic yards. Enter the depth in feet in the calculator, using the unit picker next to the depth field.

Raising a grade or building a pad

When you raise a whole area, measure the depth at the low corner and at the high corner and use the average. For a pad 24 feet by 24 feet raised 8 inches on average, you need 14.22 cubic yards of loose fill before compaction.

Round and odd-shaped areas

Use the Circle tab for round areas and Triangle for corners. For anything irregular, split it into simple shapes, run each one, and add the results. The cubic yard calculator page explains each shape formula.

What does 1 cubic yard of dirt cover?

One cubic yard of dirt covers less ground the deeper you spread it. A yard of dirt is 27 cubic feet, so divide 27 by the depth in feet:

Area one yard of dirt covers at each depth
Depth (in)Area covered by 1 yd³ (ft²)Cubic yards per 100 ft² (yd³)
21620.62
31080.93
4811.23
6541.85
12273.7
Pure arithmetic: 27 cubic feet ÷ (depth in inches ÷ 12). Rounded to 2 decimals.

So a single yard of dirt fills a low spot about 162 square feet in size at 2 inches, but only 27 square feet if it is 1 foot deep.

How much does a yard of dirt weigh?

A cubic yard of dry, loose fill dirt weighs about 2,106 pounds[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing, which is 1.05 tons[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing. Clay is lighter when dry and loose, and wet soil is much heavier.

Cubic yard of dirt weight compared with other fill (dry, loose)
MaterialTypical weight (lb/yd³)Published range (lb/yd³)Tons per yd³ (tons)
Fill dirt (earth, loam or silt)[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing2,1061,900–2,2001.05
Clay[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing1,8361,700–2,0000.92
Sand[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing2,7002,600–2,9001.35
Gravel[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing2,8352,700–3,0001.42
Typical weight is the Rockland figure where it falls inside the U.S. Army FM 5-434 range. Moisture and compaction raise the weight. Tons are short tons of 2,000 lb.

Moisture makes the biggest difference. The Army manual puts wet loam at 2,800 to 3,200[src] Sources: Headquarters, Department of the Army pounds per cubic yard, compared with 1,900 to 2,200[src] Sources: Headquarters, Department of the Army dry. That matters for trailers and small trucks, so check the payload before you haul it yourself. To turn any volume into tons, use the convert cubic yards to tons tool.

Loose vs compacted fill dirt

Fill dirt arrives loose and shrinks when you compact it. The U.S. Army earthmoving manual gives average factors:

How volume changes: in the ground, loose in the truck, and compacted
Material1 yd³ in the ground → loose (yd³)1 loose yd³ → compacted (yd³)1 loose yd³ → in-ground (yd³)
Sand or gravel[src] Sources: Headquarters, Department of the Army1.110.860.9
Loam (common earth)[src] Sources: Headquarters, Department of the Army1.250.720.8
Clay[src] Sources: Headquarters, Department of the Army1.430.630.7
Factors from U.S. Army FM 5-434, Table 1-1. They are averages; grain size and moisture change them.

For loam (common earth), one loose cubic yard compacts to about 0.72[src] Sources: Headquarters, Department of the Army cubic yard. If you need 4 cubic yards of compacted fill, order about 5.56 cubic yards[src] Sources: Headquarters, Department of the Army loose. For clay the factor is 0.63[src] Sources: Headquarters, Department of the Army, so the difference is even larger. Use the extra field in the calculator to add this margin.

How many truckloads of dirt?

How many truckloads you need depends on the truck. The Texas Department of Transportation says single-axle trucks normally carry 6 cubic yards[src] Sources: Texas Department of Transportation of aggregate, and tandem-axle beds usually hold 12 or 14 cubic yards[src] Sources: Texas Department of Transportation. The Kentucky Transportation Cabinet describes single-axle dumps as almost 60%[src] Sources: Kentucky Transportation Cabinet Highway Knowledge Portal (Kentucky Transportation Center, University of Kentucky) of a tandem’s capacity.

The calculator counts both. For example, 20 cubic yards of fill is 2 tandem loads[src] Sources: Texas Department of Transportation; Kentucky Transportation Cabinet Highway Knowledge Portal (Kentucky Transportation Center, University of Kentucky) or 4 single-axle loads[src] Sources: Texas Department of Transportation; Kentucky Transportation Cabinet Highway Knowledge Portal (Kentucky Transportation Center, University of Kentucky). The guide on how many yards fit in a dump truck covers truck sizes in more detail.

Fill dirt, topsoil or garden soil?

Fill dirt is for bulk: raising grades, filling holes and backfilling walls. Where you want plants to grow, put topsoil or a garden mix on top of the fill.

How much is dirt?

Dirt prices vary by region, by season and by whether the fill is screened, so this site does not publish a price. Ask a local supplier for the price per cubic yard or per ton and any delivery fee, then enter it under More options. The calculator multiplies your price by the volume or weight, so you can compare quotes side by side.

Worked examples

Backfilling a pool hole. A hole 16 feet by 32 feet and 4 feet deep holds 2,048 cubic feet, or 75.85 cubic yards loose. That is 7 tandem loads[src] Sources: Texas Department of Transportation; Kentucky Transportation Cabinet Highway Knowledge Portal (Kentucky Transportation Center, University of Kentucky) at the TxDOT figure.

Leveling a side yard. An area 40 feet by 12 feet raised an average of 3 inches needs 4.44 cubic yards, about 4.68 tons[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing dry.

Building up a shed pad. A pad 12 feet by 16 feet built up 6 inches after compaction needs 3.56 cubic yards compacted. With the loam factor, order about 4.94 cubic yards[src] Sources: Headquarters, Department of the Army loose.

Common mistakes

Frequently asked questions

How much dirt do I need?

Multiply the length and width of the area in feet by the depth in feet, then divide by 27 to get cubic yards. Filling an area 20 feet by 15 feet by 6 inches takes 5.56 cubic yards of loose fill dirt, before any extra for settling.

How much does 1 yard of dirt weigh?

A cubic yard of dry, loose fill dirt weighs about 2,106 pounds, or 1.05 tons. The U.S. Army earthmoving manual lists dry loam at 1,900 to 2,200 pounds per cubic yard. Wet dirt is heavier.

How much area does a yard of dirt cover?

One cubic yard of dirt covers 54 square feet at 6 inches deep, 81 square feet at 4 inches and 162 square feet at 2 inches.

How much extra fill dirt should I order for compaction?

It depends on the soil and how hard you pack it. The Army manual says one loose cubic yard of loam compacts to about 0.72 cubic yard, so for 4 cubic yards compacted you would order about 5.56 cubic yards loose.

How many yards of dirt fit in a dump truck?

The Texas Department of Transportation says single-axle trucks normally carry 6 cubic yards of aggregate and tandem-axle trucks usually hold 12 or 14 cubic yards. Ask your supplier how much dirt they load per trip.

How much is dirt?

Prices for fill dirt vary by region and by whether it is screened, so this site does not publish a price. Enter your local price per cubic yard or per ton under More options and the calculator gives the cost.

Sources and references

  1. Headquarters, Department of the Army. FM 5-434 Earthmoving Operations, Table 1-2. Material Weight, Swell Percentages, and Load Factors. vulcanhammer.net/wp-content/uploads/2017/01/fm5_434.pdf. Accessed November 11, 2026.
  2. Rockland Manufacturing. Weights of Materials. rocksi.rocklandmfg.com/desktop/assets/Rockland-Weights-of-Materials.pdf. Accessed November 11, 2026.
  3. Texas Department of Transportation. Seal Coat and Surface Treatment Manual, Section 5: Haul Trucks — Size. www.txdot.gov/manuals/mnt/scm/equipment_inspection/haul_trucks-i1008556/size-i1008586.html. Accessed November 11, 2026.
  4. Kentucky Transportation Cabinet Highway Knowledge Portal (Kentucky Transportation Center, University of Kentucky). Dump Truck | Highway Knowledge Portal. kykp.gov/knowledge-portal/articles/truck-dump/. Accessed November 11, 2026.

Update history

  • — First published.