20x30 Concrete Slab Cost

20x30 concrete slab cost at 4 in thick: 7.41 yd³ of concrete, $881[src] Sources: HomeGuide to $1,444[src] Sources: ConcreteNetwork.com at 2026[src] Sources: HomeGuide; ConcreteNetwork.com prices.

What do you know?

Try 5 or 6 in too.

Your supplier's quote.

At published national prices

$881–$1,444

Cubic yards
7.41 yd³
At HomeGuide range (January 2026)
$881–$1,089
At ConcreteNetwork.com range (July 2026)
$1,185–$1,444

At the published national price ranges, 7.41 cubic yards of concrete costs about $881 to $1,444. Enter your supplier's price per cubic yard for your own total.

Prices vary by region, season and supplier. Published ranges are for comparison only.

Estimate only — confirm quantities with your supplier before ordering.

More options: fees and extra

Delivery, short-load or Saturday charges.

Added to the amount before pricing.

The calculator starts at 30 × 20 ft, 4 in thick. Enter your quoted price per yard to total the concrete, and add any delivery fees.

Key facts

20 × 30 ft slab drawn to scale against the other slab sizes, on a 10 ft grid30 ft20 ftgrid: 10 ft squares
The 20 × 30 ft slab (600 square feet), shaded, with the other slab sizes on this site dashed for comparison. Drawn to scale on a 10 ft grid.

Concrete for a 20x30 slab

A 20x30 slab is half again the size of a 20x20. The thickness decides whether it is one truck or two:

Concrete for a 20 × 30 ft slab, by thickness
Thickness (in)Volume (ft³)Volume (yd³)With 5% extra (yd³)With 10% extra (yd³)
4[src] Sources: HomeGuide2007.417.788.15
5[src] Sources: HomeGuide2509.269.7210.19
6[src] Sources: HomeGuide30011.1111.6712.22
600 ft² × thickness ÷ 12 ÷ 27. HomeGuide suggests adding 5% to 10% for waste and spills.

That threshold is the key planning fact for this size. At 4 inches, even with 5% to 10%[src] Sources: HomeGuide extra, the concrete fits on one mixer truck, which holds 8 to 12 cubic yards[src] Sources: National Ready Mixed Concrete Association (NRMCA). At 6 inches the order passes 11 cubic yards before extra, so it may need a second truck depending on the plant’s mixers.

20x30 concrete slab cost

Concrete only. At published ready-mix ranges:

Ready-mix concrete cost for a 20 × 30 ft slab at published prices
Thickness (in)Volume (yd³)At HomeGuide range (January 2026)At ConcreteNetwork.com range (July 2026)Short-load charge (January 2026)
4[src] Sources: HomeGuide; ConcreteNetwork.com7.41$881 – $1,089$1,185 – $1,444+ $393
5[src] Sources: HomeGuide; ConcreteNetwork.com9.26$1,102 – $1,361$1,481 – $1,806+ $491
6[src] Sources: HomeGuide; ConcreteNetwork.com11.11$1,322 – $1,633$1,778 – $2,167not expected
Concrete only, before tax, labor, forms, base and reinforcement. HomeGuide prices a full truck at about 10 cubic yards and adds a short-load charge below that; ask your supplier where their short load stops.

At 6 inches the order is above the full truck of about 10 cubic yards[src] Sources: HomeGuide HomeGuide prices, so a short-load charge should not apply. At 4 inches it is below that, so ask your plant.

Finished slab. HomeGuide prices plain poured concrete at $5 to $10 per square foot (HomeGuide, as of January 2026)[src] Source: HomeGuide and ConcreteNetwork.com at $6.50 to $10.50 per square foot (ConcreteNetwork.com, as of July 2026)[src] Source: ConcreteNetwork.com. For 600 square feet, that is $3,000[src] Sources: HomeGuide to $6,000[src] Sources: HomeGuide, or $3,900[src] Sources: ConcreteNetwork.com to $6,300[src] Sources: ConcreteNetwork.com.

Pouring a 20x30 slab

Placing 7.41 cubic yards takes time. HomeGuide says “The usual pouring time is 10 minutes per yard”[src] Sources: HomeGuide, so a full truck of about 10 cubic yards[src] Sources: HomeGuide takes 1 hour and 40 minutes[src] Sources: HomeGuide to pump. At that pace the 4 inch slab is over an hour of placing before finishing starts. If two trucks are needed at 6 inches, ask the plant to space them so the second arrives as the first is emptied.

Bags are not a realistic option at this size:

Bags of concrete mix for a 20 × 30 ft slab
Thickness (in)40 lb bags60 lb bags80 lb bags
4[src] Sources: The QUIKRETE Companies; Sakrete (CRH)667445334
5[src] Sources: The QUIKRETE Companies; Sakrete (CRH)834556417
6[src] Sources: The QUIKRETE Companies; Sakrete (CRH)1,000667500
Volume ÷ the yield Quikrete and Sakrete print for each bag, rounded up. No extra included.

Base and grading

If the slab sits on compacted gravel over graded soil, an example 4 inch gravel base is 7.41 cubic yards loose, about 10.5 tons[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing dry; the gravel calculator adjusts for other depths. ConcreteNetwork.com lists the subbase as the cost of gravel or sand delivered to the site, and notes that grading is priced by the hour for a tractor and operator.

Reinforcement

ConcreteNetwork.com’s view is that reinforcement keeps cracks small, using “Wire mesh, re-bar, plastic mesh, and fiber in the mix”[src] Sources: ConcreteNetwork.com. Local building rules and your contractor should set the reinforcement and thickness for your slab.

Squaring a 20x30 form

For a 20x30 slab, each diagonal should measure 36.06 feet, a hair over 36 feet (36 feet 0.7 inches). Measure both; equal diagonals mean square corners. The perimeter is 100 feet, so straight, well-braced boards matter.

The cost of one more inch

On 600 square feet, one inch of thickness is 1.85 cubic yards of concrete: $220[src] Sources: HomeGuide to $361[src] Sources: ConcreteNetwork.com at published ready-mix ranges. Moving from 4 to 6 inches adds 3.7 cubic yards, which is what pushes this slab from one truck toward two.

Worked example: a 20x30 slab at 4 inches

Suppose a plant quotes HomeGuide’s low-end price and the order is placed on a Saturday. The slab needs 7.41 cubic yards; with 5% to 10%[src] Sources: HomeGuide extra, order about 8.15 cubic yards. HomeGuide lists a Saturday charge of $8 per cubic yard[src] Sources: HomeGuide. Enter the quote, the extra and the fee in the calculator above to see the full total.

Nearby sizes

Smaller: the 20x20 slab. Larger: the 30x30 slab. Any size: the concrete calculator. Current prices: concrete cost per yard.

Frequently asked questions

How much concrete for a 20x30 slab?

7.41 cubic yards at 4 inches, 9.26 cubic yards at 5 inches and 11.11 cubic yards at 6 inches.

What does a 20x30 concrete slab cost?

The concrete at 4 inches costs about $881 to $1,444 at published ready-mix ranges. Finished, at $5 to $10 per square foot, it is $3,000 to $6,000.

How many concrete trucks for a 20x30 slab?

At 4 inches, one. At 6 inches the slab needs 11.11 cubic yards, which is 1 to 2 trucks, because mixers hold 8 to 12 cubic yards.

How long does it take to pour a 20x30 slab?

HomeGuide gives a usual pouring time of 10 minutes per yard, so the 7.41 cubic yards at 4 inches takes over an hour to place, before finishing.

How many bags for a 20x30 slab?

334 bags of 80 lb mix at 4 inches: not a realistic hand pour.

What is the diagonal of a 20x30 slab?

36.06 feet. When both diagonals of the form measure that, the corners are square.

Will a 20x30 slab have a short-load charge?

Possibly at 4 inches, where it needs 7.41 cubic yards, less than the full truck of about 10 cubic yards HomeGuide prices. At 6 inches it needs 11.11 cubic yards, so a short-load charge should not apply. Ask your plant where its short load stops.

Sources and references

  1. HomeGuide. How Much Does Concrete Cost Per Yard? (2026). homeguide.com/costs/concrete-prices. Accessed November 16, 2026.
  2. ConcreteNetwork.com. Concrete Price Considerations - Cost of Concrete. www.concretenetwork.com/concrete-prices.html. Accessed November 16, 2026.
  3. The QUIKRETE Companies. QUIKRETE Concrete Mix, Product No. 1101 — Data Sheet. www.quikrete.com/PDFs/DATA_SHEET-Concrete%20Mix%201101.pdf. Accessed November 11, 2026.
  4. Sakrete (CRH). High-Strength Concrete Mix (4,000 PSI) | Sakrete. www.sakrete.com/product/high-strength-concrete-mix/. Accessed November 11, 2026.
  5. National Ready Mixed Concrete Association (NRMCA). CIP 31 — Ordering Ready Mixed Concrete. www.nrmca.org/wp-content/uploads/2021/01/31pr.pdf. Accessed November 12, 2026.
  6. Headquarters, Department of the Army. FM 5-434 Earthmoving Operations, Table 1-2. Material Weight, Swell Percentages, and Load Factors. vulcanhammer.net/wp-content/uploads/2017/01/fm5_434.pdf. Accessed November 11, 2026.
  7. Rockland Manufacturing. Weights of Materials. rocksi.rocklandmfg.com/desktop/assets/Rockland-Weights-of-Materials.pdf. Accessed November 11, 2026.

Prices checked November 16, 2026. Prices are reviewed every 90 days; next review due February 14, 2027.