How Big Is 4 Cubic Yards?
Four cubic yards is 108 cubic feet, which fits in a box 6 feet square and 3 feet tall. Spread 4 inches deep, 4 cubic yards covers 324 square feet, about an 18 × 18 foot square.
Key facts
4 cubic yards = 108 cubic feet = 3.058 cubic meters.
At 4 inches deep it covers 324 square feet; at 6 inches, 216 square feet.
Dry gravel: about 5.67 tons[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing. Dry sand: about 5.4 tons[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing.
One single-axle dump truck load, which normally carries 6 cubic yards[src] Sources: Texas Department of Transportation.
How big is 4 cubic yards?
Four cubic yards stacks into a cube-like box: a 6 × 6 foot square base, 3 feet high. That is four one-yard cubes arranged two by two. Next to a single cubic yard in the drawing, it is twice as long and twice as wide but the same height.
Four yards is enough base gravel for a modest patio, or enough topsoil for a small new lawn, as the project table below shows.
| Unit | Equal to |
|---|---|
| Cubic feet | 108 |
| Cubic meters | 3.058 |
| Liters | 3,058 |
| Cubic inches | 186,624 |
| One-yard cubes (3 × 3 × 3 ft) | 4 |
Coverage: how much ground 4 cubic yards covers
The thicker the layer, the less ground it covers. Four cubic yards is 108 cubic feet, so divide that by the depth in feet:
| Depth (in) | Area (ft²) | Area (yd²) | Square of about |
|---|---|---|---|
| 2 | 648 | 72 | 25 × 25 ft |
| 3 | 432 | 48 | 21 × 21 ft |
| 4 | 324 | 36 | 18 × 18 ft |
| 6 | 216 | 24 | 15 × 15 ft |
Some real shapes at 4 inches deep, the depth used in many gravel examples on this site: a path 4 feet wide and 81 feet long, or a parking pad 12 feet wide and 27 feet long. The gravel calculator works these out for any size and adds tons and truckloads. For any other material or shape, use the cubic yard calculator.
What 4 cubic yards does on common projects
Here is the area 4 cubic yards covers at the depths this site’s calculators use by default, each from university extension or industry sources:
| Project | Depth used (in) | Area covered (ft²) |
|---|---|---|
| New lawn topsoil[src] Sources: Penn State Extension; New Mexico State University, College of Agricultural, Consumer and Environmental Sciences | 6 | 216 |
| Mulch in beds[src] Sources: University of Illinois Extension; The University of Tennessee Agricultural Extension Service | 3 | 432 |
| Paver patio base[src] Sources: Concrete Masonry & Hardscapes Association (CMHA); Unilock | 6 | 216 |
| Raised beds, 4 × 8 ft (example size)[src] Sources: Utah State University Extension; University of Georgia Cooperative Extension (CAES Field Report); University of Maryland Extension | 12 | 3.4 beds |
As a paver patio base at the 6 inch[src] Sources: Concrete Masonry & Hardscapes Association (CMHA); Unilock depth the concrete paver association and Unilock list for patios, 4 cubic yards covers 216 square feet, about a 12 × 18 foot patio. The paver calculator adds the bedding sand and the paver count. As new-lawn topsoil at 6 inches[src] Sources: Penn State Extension; New Mexico State University, College of Agricultural, Consumer and Environmental Sciences, the same 4 yards covers the same area.
How much 4 cubic yards weighs
Four cubic yards of dry material weighs from about 3.7 tons[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing (clay) to 5.7 tons[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing (gravel). If your supplier sells by the ton, this table tells you roughly what to order:
| Material | Typical dry weight (lb) | Typical dry (tons) | Dry range (tons) | Wet range (tons) |
|---|---|---|---|---|
| Fill dirt[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing | 8,424 | 4.21 | 3.8–4.4 | 5.4–6.4 |
| Topsoil[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing | 8,424 | 4.21 | 3.8–4.4 | — |
| Sand[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing | 10,800 | 5.4 | 5.2–5.8 | 5.6–6.5 |
| Gravel[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing | 11,340 | 5.67 | 5.4–6 | 5.6–6.8 |
| Clay[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing | 7,344 | 3.67 | 3.4–4 | — |
Take gravel: 4 yards is about 5.7 tons[src] Sources: Headquarters, Department of the Army; Rockland Manufacturing dry, so an order of that many tons gives about 4 cubic yards. Moisture shifts the number, which is why the scale ticket is the final word. For other volumes, the cubic yards to tons converter uses the same weights.
4 cubic yards in bags
Four cubic yards is 54 bags of 2 cubic feet. At that count, buying, carrying and opening bags takes far longer than spreading a delivered pile.
| Bag | Bags needed |
|---|---|
| 0.75 cu ft bag (soil, mulch) | 144 |
| 1 cu ft bag (soil, mulch) | 108 |
| 1.5 cu ft bag (soil, mulch) | 72 |
| 2 cu ft bag (soil, mulch) | 54 |
| 3 cu ft bag (soil, mulch) | 36 |
| 40 lb bag of concrete mix[src] Sources: The QUIKRETE Companies; Sakrete (CRH) | 360 |
| 60 lb bag of concrete mix[src] Sources: The QUIKRETE Companies; Sakrete (CRH) | 240 |
| 80 lb bag of concrete mix[src] Sources: The QUIKRETE Companies; Sakrete (CRH) | 180 |
For concrete, 4 cubic yards is 180 bags[src] Sources: The QUIKRETE Companies; Sakrete (CRH) of 80 lb mix. Ready-mix trucks are the practical way to place that much; the concrete calculator compares bags and ready-mix at your prices.
Truckloads for 4 cubic yards
Four cubic yards fits on one truck:
| Truck | Typical bed (yd³) | Loads |
|---|---|---|
| Single-axle dump truck[src] Sources: Texas Department of Transportation; Kentucky Transportation Cabinet Highway Knowledge Portal (Kentucky Transportation Center, University of Kentucky) | 6 | 1 |
| Tandem-axle dump truck[src] Sources: Texas Department of Transportation; Kentucky Transportation Cabinet Highway Knowledge Portal (Kentucky Transportation Center, University of Kentucky) | 12 | 1 |
On a single-axle truck, 4 yards leaves about a third of the bed empty, so ask whether the supplier can add a second material on the same trip. If you are removing soil rather than delivering it, the swell factor matters: 4 cubic yards of in-ground loam becomes about 5 loose cubic yards[src] Sources: Headquarters, Department of the Army once dug, according to the U.S. Army earthmoving manual.
Ordering 4 cubic yards without coming up short
- Base layers compact. Gravel and sand under a patio get tamped. Using the Army manual’s factor, 4.65 loose cubic yards[src] Sources: Headquarters, Department of the Army compacts to 4 cubic yards.
- Measure depth in inches. Then divide by 12 to get feet.
- Order a little over. Running short means a second delivery fee.
Compare nearby sizes: 3 cubic yards or 5 cubic yards.